T131 (TW-1.2)
New Seal - This sign is used as soon as new sealing work has been completed and should remain in position until all loose chip has been removed and new road markings have been installed. Used on Level 1 Roads or Level 2/3 Roads.
New Seal - This sign is used as soon as new sealing work has been completed and should remain in position until all loose chip has been removed and new road markings have been installed. Used on Level 1 Roads or Level 2/3 Roads.